(corey, greg, hugo, jim, mitch)
#6
Performed ISI tilt measurements. While doing this it was discovered that H1 (s/n094) was not acceptable. It was removed and was replaced with the one spare horizontal GS13 on hand (s/n 018). Then continued with performance measurements on the ISI with new H1 GS13.
#7
Ribs were prepped for Stage1 Assembly. These Ribs were individually installed on the Stage1 Floor (vs. pre-assembling the Pitchfork/Boxworks and installing them on Stage1). Keel Walls were installed, and other parts were also set up on Stage1. Should have Stage1 on Stage0 tomorrow.