vernon.sandberg@LIGO.ORG - posted 14:55, Tuesday 29 November 2016 (31978)
Work Permit Summary for 2016 November 29
Work Permit Date Description alog/status
6363.html 2016-11-29 14:14 change IFO node to disallow SDF diffs in the decision for observation mode. Review current exceptions list prior to O2.  
6362.html 2016-11-29 09:54 Replace POP90 demod chassis. See alog 31948. 31971
6361.html 2016-11-29 08:59 Reconfigure power to the Vault equipment to provide +-12Vdc instead of just +12. Power up equipment and get signals to MidX  
6360.html 2016-11-29 08:16 Connect electronics to PT180 sensor tube and energize*Open isolation valve to expose PT180 to site vacuum volume*vent locally mounted turbo, remove and replace it with 1 1/2" O-ring valve + nominal 2.75"CF-NW40 adapter*Pump to rough vacuum the volume between in-series 1 1/2" pump port valves 31970
6359.html 2016-11-29 06:41 Tour AREVA group (~8) around site, including LVEA.  
6358.html 2016-11-28 17:33 Update vacuum alarm handler at ops station: Add _ERROR channels for all existing channels. Add all pressure gauges. Remove all commented out channels except CP3. Update guidance text. 31965
6357.html 2016-11-28 16:09 For each Vacuum channel being monitored by the cell phone texter, also monitor the corresponding ERROR channel and alarm any errors are non-zero.  
6356.html 2016-11-28 14:55 Change displays in control room in preparation for O2. Add DARM BLRMS to Video0 (sharing with ASC Err sigs). Remove SDF overview screen from Video0 (information is already redundant with newly updated CDS overview screen). Ensure templates are linked to userapps repo, so that most up-to-date FOM is displayed upon computer reboot.  
6355.html 2016-11-28 14:10 Install RF Amplifiers (ZHL-1A+) to add gain to the indoor PEM antenna signals from CER/LVEA.  31928
6354.html 2016-11-28 11:48 Remove BP_IN1 channels from DAQ list in h1susprocpi for modes not being actively damped (all except modes 3, 26, 27, 28)  31927
6353.html 2016-11-28 11:36 ECR1600351, add 41 fast DQ channels to H1BROADCAST0.ini, restart dmt-broadcaster.  31927
6352.html 2016-11-28 10:56 Update Matlab license, there will be a 15 minutes interruption on Matlab. WP#6352 & WP#6351 are duplicates
6351.html 2016-11-28 10:56 Update Matlab license, there will be a 15 minutes interruption on Matlab.  
6350.html 2016-11-28 10:10 Remove some channels from the frame to save data rate. h1alsex: Remove H1:LSC-X_EXTRA_AI channels from the commissioning frame. No need to archive. h1alsey: Same as h1alsex. h1lsc: Remove H1:LSC-JITTERFF_OUT from the commissioning frame. This feature is not used for now and no need to archive.  31927
6349.html 2016-11-28 10:01 Investigate communication issues withing Beckhoff that began when Kyle powered down PT180  
6348.html 2016-11-28 10:00 Adjust the laser power on the ETMx and ETMy oplev lasers in an attempt to fix the ongoing laser glitches.  31909
6347.html 2016-11-28 09:54 Forklift PSL backup chiller from Mechanical building to OSB receiving.  
6346.html 2016-11-28 08:21 Update the calibration code to gstlal-calibration-1.0.9-v1, fix bugs, apply calibration factors, and apply new filters: * Update calib_state_vector calculation to better accommodate changes in kappa smoothing. * Add check for overflow input to GDS pipeline. * Apply the real parts of kappa_tst, kappa_pu, and kappa_c at LHO. * Update the calibration filter file as needed.  31926 & 31924
6345.html 2016-11-25 14:42 Replace piezo mirror mount on PSL table. This is the implementation of E1500404 and FRS4639. The work may or may not be done: alignment and PEM injections are higher priority. Approved by Keita. 31935 & 31974