Reports until 14:50, Thursday 21 June 2012
H1 FMP
jodi.fauver@LIGO.ORG - posted 14:50, Thursday 21 June 2012 (3203)
HAM5/6 ICC
First thing this morning, the doors were returned to HAM6 and the south door was removed from HAM5. Brushing was completed in HAM5 before lunch.(The condition of this chamber is much better than what we saw in HAM6 and cleaned up nicely.) After lunch, the crew did first vacuum, unwrapped the support tubes, vacuumed the bellows, and started wipe down. By the end of the day, about 1/2 the chamber had been wiped down: that is much closer to the rate of progress that we are used to instead of the VERY SLOW pace we saw in HAM6. We hope to close out tomorrow.