TITLE: 12/01 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Cheryl
CURRENT ENVIRONMENT:
Wind: 7mph Gusts, 5mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.42 μm/s
QUICK SUMMARY:
Received status about how the night/morning went from Cheryl.
16:35: Since we are not LOCKED, performing memory upgrade for h1guardian0 (WP6366, via Carlos).
Will get back to locking afterward and investigate around DC Readout and wait for assistance.