Betsy, Keita, Daniel
As part of the LVEA sweep, prior to the start of O2, this morning, we spent over an hour doing a cleanup of misc cables and test equipment in the LVEA and electronics room. There were quite a few cables dangling from various racks, here's the full list of what we cleaned up and where:
Location | Rack | Slot | Description |
Electronics Room | ISC C2 | Found unused Servo controller/cables/mixer from top of rack. Only power was connected, but lots of dangling cables. Removed entire unit and cables. | |
Electronics Room | ISC C3 | 19 | D1000124 - Port #7 had dangling cable - removed and terminated. |
Electronics Room | ISC C4 | Top | Found dangling cable from "ALS COM VCO" Port 2 of 6. Removed and terminated. |
Electronics Room | Rack next to PSL rack | Dangling fiber cable. Left it... | |
LVEA near PSL | ISC R4 | 18 | ADC Card Port stickered "AO IN 2" - Dangling BNC removed. |
LVEA near PSL | ISC R4 | 18 to PSL P1 | BNC-Lemo with restor blue box connecting "AO2" R4 to "TF IN" on P1 PMC Locking Servo Card - removed. |
LVEA near PSL | ISC R4 | 20 | T'd dangling BNC on back of chassis - removed T and unused BNC. |
LVEA near PSL | Disconnected unused O-scope, Analyzer, and extension cords near these racks. | ||
LVEA | Under HAM1 south | Disconnected extension cord running to powered off Beckhoff Rotation stage termination box thingy. Richard said unit is to be removed someday altogether. | |
LVEA | Under HAM4 NE cable tray | Turned off via power cord the TV monitor that was on. | |
LVEA | HAM6 NE corner | Kiwamu powered off and removed power cables from OSA equipment near HAM6 ISCT table. | |
LVEA | Unplugged/removed other various unused power strips and extension cords. |
I also threw the main breaker to the OFF position on both of the free standing unused transformer units in the LVEA - one I completely unplugged because I thought I could still hear it humming.
No monitors computers appear to be on except the 2 VE BECKHOFF ones that must remain on (in their stand alone racks on the floor).
We'll ask the early morning crew to sweep for Phones, Access readers, lights, and WIFI first thing in the morning.
Final walk thru of LVEA was done this morning. The following items were unplugged or powered off:
Phones
1. Next to PSL Rack
2. Next to HAM 6
3. In CER
Card Readers
1. High Bay entry
2. Main entry
Wifi
1. Unplugged network cable from patch panel in FAC Rack
Added this to Ops Sticky Notes page.