Displaying report 1-1 of 1.
Reports until 16:09, Saturday 03 December 2016
LHO General
patrick.thomas@LIGO.ORG - posted 16:09, Saturday 03 December 2016 (32150)
Ops Day Shift Summary
TITLE: 12/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 73.8494Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Remained in observing for duration of shift. LLO is down to work on their laser. A couple of EY saturations but otherwise quiet.
LOG:
17:38 - 17:43 UTC Evan G. into MSR to look for USB cable for external drive
17:46 UTC EY saturation
18:47 UTC EY saturation
21:03 UTC LLO starting diode replacement
22:52 UTC Restarted video2 (MEDM screens not updating)
23:11 - 23:28 UTC Rick leading small tour through control room
Displaying report 1-1 of 1.