Reports until 00:47, Sunday 04 December 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 00:47, Sunday 04 December 2016 (32158)
Ops Owl Shift Transition

TITLE: 12/04 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC

STATE of H1: Observing at 67.6212Mpc

OUTGOING OPERATOR: Ed

CURRENT ENVIRONMENT: Wind: 36mph Gusts, 31mph 5min avg Primary useism: 0.15 μm/s Secondary useism: 0.62 μm/s

QUICK SUMMARY: Still locked since last night. 17 hours and counting. I went through Ops sticky note and was thinking about running a2l since I didn't run it the first two hours into the lock last night. The coherence plot (from Keita's template) looks fine. Then I saw Ed's comment about the plan changed. So no a2l.

Images attached to this report