kyle.ryan@LIGO.ORG - posted 16:42, Monday 05 December 2016 (32209)
Pumping PT180 @ BSC8 overnight
Leaving "temporary" rotating shaft pumps run at BSC8 overnight as LLO is still offline. The expectation is to shut these down at the end of maintenance tomorrow or when LLO is back up (which ever occurs last, i.e. maximize pumping time)