TITLE: 12/06 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
Wind: 8mph Gusts, 6mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.48 μm/s
QUICK SUMMARY: Patrick was halfway done with IA when I arrived. I finished IA and have locked DRMI a couple of times now. I stopped at DRMI to let Sheila go to the LVEA to adjust the focus on the newly installed SRM digital camera. Carrying on with locking now.