(Kyle, Gerardo)
Installed annulus ion pump hardware at the H2 input mode cleaner tube. The entire system is ready to be pump down and turned on next maintenance day.
Notes about installation: we vented, the already vented annulus space, installed all hardware, pump, controller and managed to pump it down to 4.2x10^-05 torr, then maintenance period was over.
Items to complete next maintenance day: pump the system down, leak check and turn ion pump on.
Work done under WP#6386.