Displaying report 1-1 of 1.
Reports until 16:08, Tuesday 06 December 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:08, Tuesday 06 December 2016 (32268)
Ops Day Shift Summary
Ops Shift Log: 12/06/2016, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time -  UTC (PT)
State of H1: IFO is down due to two earthquakes within about an hour
Intent Bit: Commissioning
Support: Jeff K., Keita, Jenne, Terra
Incoming Operator: Travis
Shift Summary:  After the scaled down maintenance window (due to maintenance work done on Monday), tried relocking. Found green power in low in both arms. Ran an initial alignment and relocked on the first attempt. Sat at NOMINAL_LOW_NOISE in Commissioning while Evan did some commissioning work on the ITM Reaction Chain alignment.
   Went to commissioning when Evan finished.
   Rode through a 5.8Mag EQ centered around Trinidad.
   Lost lock due to 6.4Mag EQ in Indonesia.
   Put IFO into DOWN until microseism drops below 1.0um/s.  
   
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from TJ
16:19 (08:19) Chris – Escorting pest control through LVEA
16:20 (08:20) MY_CP4_LT250_PUMP_LEVEL_PCT alarm – Cleared on own
16:34 (08:34) Take IFO to Commissioning for start of maintenance 
16:45 (08:45) Richard – Moving fiber bundles in MSR - (WP #6292)
16:45 (08:45) Chris – Finished at CS, Escorting pest control to Mid-Y and End-Y
16:46 (08:46) Christina – Going to End-X for cleaning
16:48 (08:48) Karen – Going into the LVEA to clean around Ham4, 5, 6, and high-bay
16:50 (08:50) Jim – Going to End-X to unplug the WAP
16:50 (08:50) Carlos – Going to End-Y to unplug the WAP
17:00 (09:00) Richard – Taking Scott M (LLO) into LVEA to look at vacuum racks
17:00 (09:00) Joe – Going into LVEA to check eyewash stations
17:05 (09:05) Cintas on site to service matts
17:10 (09:10) Kyle & Gerardo – Going into LVEA to work on PT180 - (WP #6377)
17:11 (09:11) Norco on site to deliver N2 to CP2
17:18 (09:18) Jim – Back from End-X
17:19 (09:19) Richard & Scott – Out of LVEA
17:31 (09:31) Lockloss – Due to maintenance activities
17:37 (09:37) Carlos – Back from End-Y – Reports the parking lot is very icy 
17:45 (09:45) Christina – Leaving End-X
17:46 (09:46) Joe – Out of the LVEA
17:46 (09:46) Chris – Pest control finished at ends and corner – Working down the arms
17:50 (09:50) Karen – Out of the LVEA
18:08 (10:08) Alfredo & Elizabeth – Going to Mid-Y to do inventory
18:30 (10:30) Dave – Going to Mid-X and Mid-Y to unplug WAP
18:44 (10:44) Joe – Going into LVEA to service first aid stations
18:47 (10:47) Norco leaving site
18:52 (10:52) Rana – Escorting tour in the LVEA (WP #6387)
18:57 (10:57) Richard & Evan – Focusing camera at SRM (WP #6371)
19:06 (11:06) Dave – Back from Mid-Stations
19:20 (11:20) Richard & Evan – Out of the LVEA
19:27 (11:27) Alfredo & Elizabeth – Back from Mid-Y
19:36 (11:36) Paradise Water on site to deliver water
19:40 (11:40) Dave – Power recycle LIGO file system server (WP #6388)
19:44 (11:44) Bubba – Inspection tour of LVEA
20:05 (12:05) Patrick – Doing sweep of the LVEA
20:10 (12:10) Reset Fiber Polarization on X Arm
20:12 (12:12) Kyle & Gerardo – Out of the LVEA
20:15 (12:15) Start to relock
21:31 (13:31) After Initial alignment – Relocked at NOMINAL_LOW_NOISE, 27.9W, 66.7MPc
21:31 (13:31) In Commissioning mode - Evan & Rana work on ITM reaction chain alignment 
22:00 (14:00) Damp PI modes 9, 26, 27, 28
22:14 (14:14) Rode through a Mag 5.8 EQ near Trinidad 
22:19 (14:19) Set mode to Observing
23:08 (15:08) Lost lock due to 6.4Mag EQ in Indonesia. Primary microseism up to 7.0um/s
23:09 (15:09) Put IFO into down until microseism settles down
00:00 (16:00) Turn over to Travis 
Displaying report 1-1 of 1.