TITLE: 12/08 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 68.7782Mpc
OUTGOING OPERATOR: Jeff
CURRENT ENVIRONMENT:
Wind: 10mph Gusts, 8mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.29 μm/s
QUICK SUMMARY: Observing for 23 hours now.
0:10 Intent bit set to commissioning so Evan can turn off high frequency PCal line for HW inj.
0:11 Evan accepted the new SDF diff for PCal, so we went back to Observe.
0:17 Injection gain ramping dropped us out of Observe, Evan set this gain to 'Not Monitored', and we were back to Observe within the minute
0:34 PCal HF line turned back on, out of Observe. I am running a2l since it looks like it is time, and Sheila is opportunistically working one of her work permits.
Back to Observing at 0:48 UTC.