TITLE: 12/09 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Jim
SHIFT SUMMARY: A bit of an extended recovery from the EQs led to a late shift lock. Lost lock just before the shift ended due to PI modes ringing up while I was using the facilities.
LOG:
See previous logs for most of the story.
7:57 Lock loss.