Reports until 12:43, Friday 09 December 2016
H1 PSL (PSL)
peter.king@LIGO.ORG - posted 12:43, Friday 09 December 2016 (32395)
reference cavity alignment
Attached are plots of the reference cavity transmission for the past week.  Plotted along with
the laser room temperature, and the reflection locking photodiode output.  The decay is not due
to any degradation of the pre-modecleaner transmission.

    Correction almost always involve a pitch alignment correction, most of which is the top
mirror mount in the periscooe.
Images attached to this report