TITLE: 12/10 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 73.9225Mpc
INCOMING OPERATOR: Corey
Assistance:
SHIFT SUMMARY:
-
locked all shift
-
in Observe most of the time
-
SDF kicked H1 out of Observe twice
-
first time was EY ECAT PLC2, which had a channel toggle three times - very possibly no change to H1 config
-
second time I made a bad click and SDF went red and knocked H1 out of Observing - absolutely no change to H1 config
-
alog 32420 has all the details of the drop in Observe
-
one earthquake - H1 stayed locked and in Observing
-
no PI modes needed to be damped
-
some wind up to 20mph, but mostly under 10mph during the shift