wiki: https://wiki.ligo.org/DetChar/DataQuality/DQShiftLHO20161208 Below I summarise the main highlights of this shift: duty cycle 65.2%, the range is 70 - 75Mpc. on Thursday 8th lockloss due to multiple earthquakes keeping occuring to morning on Friday Software saturation - H1:LSC-X_ARM_CTRL [1] at ~11:00UTC on Thursday 8th 18kHz PI modes strong peak at 11:07UTC and 12:10UTC on Thursday 8th, at ~8:00UTC, ~ 9:00UTC, ~ 10:30UTC and at ~12:30 on Friday 9th. the planned stochastic injection at 00:10UTC Thursday 8th quiet on Saturday 10th and Sunday 11th