Displaying report 1-1 of 1.
Reports until 00:08, Saturday 17 December 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 00:08, Saturday 17 December 2016 (32642)
Ops EVE shift summary

TITLE: 12/17 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC

STATE of H1: Observing at 67.5322Mpc

INCOMING OPERATOR: Travis

SHIFT SUMMARY: Locked early into the shift. Had to adjust IM4 and BS to zero the error signals before engaging DRMI ASC (doing so also zeroed SRC error signal - so I guess it's good to touch these mirrors in order). The shift has been quiet since. Couple of gamma ray burst alarms. The first one (01:31:59) we were just at NLN but the intent bit wasn't set (it was set right after). We were Observing for the second one (03:04:33). Several TCSY flow alarms from 03:11 to 03:46. Went out to check the TCS chiller and the flow rate there was fine. Useism slowly picking up, BNS range is slowly dropping. I checked the coherence plot earlier and it looked okay so I didn't run a2l. I just checked recently and coherence is high in YAW so Travis is going to run it after LLO is down.

Displaying report 1-1 of 1.