Displaying report 1-1 of 1.
Reports until 16:15, Monday 19 December 2016
H1 ISC (ISC, OpsInfo)
jeffrey.kissel@LIGO.ORG - posted 16:15, Monday 19 December 2016 (32750)
Acceptable Green Power Threshold Lowered on X-Arm to More Easily Pass "Settled" Test
J. Kissel, J. Driggers, C. Gray

Ever since the sudden drop in X-arm green laser power in Oct 2016 LHO aLOG 30884, it's been a challenge to pass the metric for determining whether the arms are locked well enough to begin locking ALS -- if ALS-C_TRX_A_LF_OUTMON and ALS-C_TRY_A_LF_OUTMON are greater than 0.9 (normalized [ct]). However, we often see via other metrics that the arms have settled and are in a fine enough condition to move through ALS. 

As such, we've lowered the threshold on X arm transmission to 0.85.

This is modification to the 
/opt/rtcds/userapps/release/isc/h1/guardian/ISC_library.py
The change has been committed to the repository.
Displaying report 1-1 of 1.