Displaying report 1-1 of 1.
Reports until 19:45, Monday 19 December 2016
H1 ISC (FMP)
jeffrey.kissel@LIGO.ORG - posted 19:45, Monday 19 December 2016 (32757)
No Success Relocking Thus Far: Off in Initial Alignment LaLaLand likely due to Temperature Swings of LVEA and YVEA.
J. Kissel, N. Kijbunchoo

We're on level three distraction from what we believe is our potentially main issue/problem:
- (Level 1) We started hoping to return to nominal low noise ASAP to test whether the ETMY PUM/L2 stage coil driver swap has improved the recent plague of glitches, and/or changed that stage's coil balancing, length-to-pitch plant, or actuation strength.
- (Level 2) We then had trouble with ALS losing lock constantly before finding IR. So, we spent a few hours just going through ALS locking steps one at a time in hopes to find a specific problem. This go us no where, and as per typical, we got lucky once and made it past all the way up through COIL_DRIVERS after DC_READOUT and POWER UP. We saw an oscillation in IFO signals eventually lead to a lock loss.
- After failing again at ALS, we decided it must be initial alignment (given evidence of low green power from the X Arm).
- (Level 3) Once finished with the first round of initial alignment (which took particularly long because SR2 was in the wrong spot), we found the Y-arm totally hosed in alignment.

Now, Nutsinee and I are just chasing our tails with the Y arm green locking, likely because of the 2 [deg] C temperature swing of the YVEA after the chiller failure.

I'm going home, Nutsinee's just going to wait it out until the temperature returns to normal.
Images attached to this report
Displaying report 1-1 of 1.