Shift Summary - Owl
TITLE:
12/20 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1:
Preventitive Maintenance
INCOMING OPERATOR:
Jim
SHIFT SUMMARY:
LOG:
.3u dust alarm. winds below 10mph @ EY
3 EY glitches while observing
LLO joined in coincidence a breif couple of times
13:00 Karen on site. I went outside and salted the ground so that she could get out of her vehicle. The campus looks like a skating rink.
13:43 Intention bit to Commissioning for Jeff K to take some measurements on the new EY PUM driver.
14:32 GRB alert. H1 in commissioning. L1 is down for maintenance as per Gary Traylor.
Lockloss - unknown reason. Holding H1 down for early maintenance day start. Observatory mode set to "Preventative Maintenance"
H1 was locked for 04:32:12
15:20 Peter Heading out to the SL enclosure for alignment
15:26 Bubba and Ken to EX
15:47 Appolo on site to rep
15:50 Jeff B to PSL enclosure
15:54 Jeff heading to CER and LVEA to look for GPIB setup