Starting CP3 fill. LLCV enabled. LLCV set to manual control. LLCV set to 50% open. Fill completed in 21 seconds. TC B did not register fill. LLCV set back to 20.0% open. Starting CP4 fill. LLCV enabled. LLCV set to manual control. LLCV set to 70% open. Fill completed in 18 seconds. LLCV set back to 34.0% open.
sigh, looks like the png strip tool image wasn't available at the time the roboalog posted, here it is:
In order to quell the voices in my head and allow me to resume my "normal" activities, I had to manually overfill CP4 and CP3 after the automated routine ran. Sure enough both pumps were full!