Reports until 16:40, Thursday 28 June 2012
H1 SEI
hugh.radkins@LIGO.ORG - posted 16:40, Thursday 28 June 2012 (3298)
HAM3 Post ISI Install Work
JimW, Alex & Hugh---We forklifted and hefted in 800+lbs onto the HAM3 ISI Optical Table, enough to get it floating.  The Shipping Braces were removed and the Lockers were then locked.  We connected the CPS cabling to the feedthrus in preparation of floating and balancing.  The one missing bolt connecting the ISI to the East Support Tube, Corey noted during ISI Installation, was not successfully installed.  It remains loose and need to be removed and replaced.