Reports until 08:35, Friday 06 January 2017
H1 General
cheryl.vorvick@LIGO.ORG - posted 08:35, Friday 06 January 2017 - last comment - 13:15, Friday 06 January 2017(33020)
Ops Day Transition: Earthquake

TITLE: 01/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Earthquake
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 3mph Gusts, 2mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.36 μm/s
QUICK SUMMARY:

Comments related to this report
sheila.dwyer@LIGO.ORG - 13:15, Friday 06 January 2017 (33032)Lockloss

I looked a little bit at this lockloss, and it seems that the way in which the earthquake broke the lock was by saturating PR3 M3 with a yaw drive due to low frequency motion (20 second period).  

We should impove our offloading of PR3 drives to the top mass, which should be easy to do just by increasing the gain in the top mass filter banks. 

Images attached to this comment