Displaying report 1-1 of 1.
Reports until 00:11, Saturday 07 January 2017
LHO General
thomas.shaffer@LIGO.ORG - posted 00:11, Saturday 07 January 2017 (33053)
Ops Owl Shift Transition

TITLE: 01/07 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC

STATE of H1: Observing at 64.5778Mpc
OUTGOING OPERATOR: Travis
CURRENT ENVIRONMENT:
    Wind: 4mph Gusts, 3mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.32 μm/s 
QUICK SUMMARY: A few small earthquakes have caused some locklosses over the past 24hours. There has been some work to try and get rid of the ~1000Hz glitches, but it does not seem to have worked by looking at the glitchgram.
 
TITLE: 01/07 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 64.5778Mpc
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 4mph Gusts, 3mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.32 μm/s 
QUICK SUMMARY:
Displaying report 1-1 of 1.