Reports until 07:09, Monday 15 November 2010
H2 INS
michael.landry@LIGO.ORG - posted 07:09, Monday 15 November 2010 (331)
BSC8 deinstall status
(Cheryl, Patrick, Mitchell, Jim, Jodi, Mike)

Status in BSC8 as of Friday 4:30pm: Once the BSC door was removed, the team locked down ITMY and FMY, removed OSEMs, and began extracting auxiliary components such as black glass beam dumps and associated (unwieldy) aluminum structures. Several of the latter had galled bolts which had to be snapped to remove.  Hardware for the removal of optics and LOS structures was staged in-chamber.  We expect to complete this work today Mon 15th.