H1 General
travis.sadecki@LIGO.ORG - posted 15:52, Tuesday 10 January 2017 (33139)
Ops Day Shift Summary

TITLE: 01/10 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 58.2484Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY:  A bit of a rough IA after Maintenance Day, but after pushing through that, we have had no real issues (other than weather).
LOG:

17:03 Karen to LVEA

17:12 Peter done is PSL

17:57 Kyle to BSC8

17:59 JeffK starting charge measurements

18:11 TCSy chiller controller swap

18:44 TCSy chiller back on

19:04 Charge meas. done

19:29 Kyle out

19:43 Bubba to LVEA to check 3IFO storage

19:58 Bubba out

20:02 Karen out

Note:  Bubba has been plowing snow around the corner station with a new LARGE front end loader since ~23:00UTC.
 