TITLE: 01/10 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 58.2484Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: A bit of a rough IA after Maintenance Day, but after pushing through that, we have had no real issues (other than weather).
LOG:
17:03 Karen to LVEA
17:12 Peter done is PSL
17:57 Kyle to BSC8
17:59 JeffK starting charge measurements
18:11 TCSy chiller controller swap
18:44 TCSy chiller back on
19:04 Charge meas. done
19:29 Kyle out
19:43 Bubba to LVEA to check 3IFO storage
19:58 Bubba out
20:02 Karen out
Note: Bubba has been plowing snow around the corner station with a new LARGE front end loader since ~23:00UTC.