Displaying report 1-1 of 1.
Reports until 08:09, Thursday 12 January 2017
LHO General
patrick.thomas@LIGO.ORG - posted 08:09, Thursday 12 January 2017 (33174)
Ops Day Shift Start
TITLE: 01/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 58.2425Mpc
OUTGOING OPERATOR: Jim
CURRENT ENVIRONMENT:
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.24 μm/s 
QUICK SUMMARY: Locked and observing with double coincidence. TCSY chiller flow is low verbal alarm when I arrived. Flow had dropped to around 2.2, just came back to around 3.1.
Displaying report 1-1 of 1.