TITLE: 01/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Observing at 60.4067Mpc INCOMING OPERATOR: Corey SHIFT SUMMARY: Began locked in observing. Snow removal continued, but not near end stations. Lock loss (see Sheila's alog). Travis and Evan took the opportunity to alleviate PCALY clipping. Ran initial alignment and a2l. Sheila ran test. Accepted SDF differences from test and set to observing. LOG: 17:05 UTC Joe to mid and end stations to shovel snow around doors 17:10 UTC Filiberto and Marc to mid Y to look for parts for squeezer 17:23 UTC Chris to mid X to move snow 17:34 UTC Bubba and Ken back from mid X 18:09 UTC Chris done at mid X, moving to mid Y 18:59 UTC Chris done at mid Y, heading back to corner station 19:04 UTC Joe back from X arm 19:07 UTC Bubba to mid X to remove snow 19:54 UTC Joe to Y arm to shovel snow around doors 20:24 UTC Bubba back 20:43 UTC Joe back 22:02 UTC Out of observing for Sheila to run test. Lock loss. 22:08 UTC Evan and Travis to end Y to investigate PCAL clipping. Turned off sensor correction. 22:11 UTC Gerardo to end Y to check on cable for IP 22:17 UTC Starting initial alignment 23:01 UTC Gerardo back from end Y 23:03 UTC Initial alignment done 23:10 UTC Evan and Travis back 23:13 UTC Dave and Carlos to CER to check on switch 23:20 UTC Dave and Carlos back 23:30 UTC NLN 23:32 UTC Running a2l per Sheila's request 23:36 UTC Damped PI mode 28, a2l still running 23:58 UTC Damped PI mode 27 00:16 UTC Accepted SDF differences from Sheila's test (see attached) and set to observing.