Reports until 16:23, Thursday 12 January 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:23, Thursday 12 January 2017 (33189)
Ops Day Shift Summary
TITLE: 01/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 60.4067Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Began locked in observing. Snow removal continued, but not near end stations. Lock loss (see Sheila's alog). Travis and Evan took the opportunity to alleviate PCALY clipping. Ran initial alignment and a2l. Sheila ran test. Accepted SDF differences from test and set to observing.
LOG:
17:05 UTC Joe to mid and end stations to shovel snow around doors
17:10 UTC Filiberto and Marc to mid Y to look for parts for squeezer
17:23 UTC Chris to mid X to move snow
17:34 UTC Bubba and Ken back from mid X
18:09 UTC Chris done at mid X, moving to mid Y
18:59 UTC Chris done at mid Y, heading back to corner station
19:04 UTC Joe back from X arm
19:07 UTC Bubba to mid X to remove snow
19:54 UTC Joe to Y arm to shovel snow around doors
20:24 UTC Bubba back
20:43 UTC Joe back
22:02 UTC Out of observing for Sheila to run test. Lock loss.
22:08 UTC Evan and Travis to end Y to investigate PCAL clipping. Turned off sensor correction.
22:11 UTC Gerardo to end Y to check on cable for IP
22:17 UTC Starting initial alignment
23:01 UTC Gerardo back from end Y
23:03 UTC Initial alignment done
23:10 UTC Evan and Travis back
23:13 UTC Dave and Carlos to CER to check on switch
23:20 UTC Dave and Carlos back
23:30 UTC NLN
23:32 UTC Running a2l per Sheila's request
23:36 UTC Damped PI mode 28, a2l still running
23:58 UTC Damped PI mode 27
00:16 UTC Accepted SDF differences from Sheila's test (see attached) and set to observing.
Images attached to this report