TITLE: 01/17 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventitive Maintenance
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Maintenance day. Some work at EY and a stuck Norco truck at EX kept us from starting to lock on time. I just finished an initial alignment but I an having trouble keeping the arms locked in green now. Handing it off to Jeff.
LOG:
-
16:01 Joe to LVEA to start charging.
-
16:18 Joe out.
-
16:33 Manually broke the lock to allow PCAL crew to do their work at EY. Betsy will start charge measurement for EX.
-
16:39 Joe to the roof to clear snow.
-
16:45 Peter starting WP6436
-
17:10 Christina to EX (holding off going to the VEA till charge meas. is complete), Karen to EY.
-
17:16 Fil, Gerardo to EY
-
17:30 JimW, Robert to EY to install STS table on BRS
-
17:35 Ed to LVEA to work on TCS rack.
-
17:37 Norco trucks at gate, one to EX other to CS(80)
-
17:59 Betsy to LVEA to look at ITM OpLevs
-
18:07 Peter, Jason done
-
18:18 Betsy out.
-
18:32 Marc to EY to deliver parts
-
18:55 Christina leaving EX
-
19:00 PCAL crew leaving EY
-
19:04 JimW, Robert back
-
19:15 Hugh to EX
-
19:20 Robert to LVEA to set up
-
19:26 Ed out
-
19:33 Joe and Robert out
-
19:40 Robert to LVEA
-
1947 Hugh back
-
21:00 Jim W to EY to attempt to settle BRS a bit more
-
21:25 Gerardo, Fil, Marc back
-
21:51 Bubba to EY to check on contractor in chiller yard
-
22:25 Jim W back