Reports until 16:42, Tuesday 17 January 2017
LHO General
jeffrey.bartlett@LIGO.ORG - posted 16:42, Tuesday 17 January 2017 (33394)
Ops Evening Shift Transition

Ops Shift Transition:01/17/2017, Evening Shift 00:00 – 08:00 (16:00 - 00:00) - UTC (PT)

State of H1: IFO unlocked after maintenance window
Intent Bit: Commissioning/Locking
Weather: Wind is a Gentle Breeze (8- 12 mph), cold, cloudy, with a chance of freezing rain
Primary 0.03 – 0.1Hz: Currently at 0.08um/s and decreasing
Secondary 0.1 – 0.3Hz: Currently at 0.4um/s and increasing
Quick Summary: Working on relocking IFO after extended maintenance window.      
Outgoing Operator: TJ