16:30 Robert on site looking to do injections. See ensuing aLogs
16:45 spoke to Livingston. They don't anticipate being able to lock anytime soon due to deteriorating weather conditions and high microseism.
18:41 PI Mode 28 damped. Switched polarity on phase.
20:15 Sheila on site. Troubles doing INPUT_ALIGN. She's adjusting the gain configuration.
22:30 NLN
23:05 Robert back out to LVEA
23:20 Robert back and finished
23:23 Intention bit Undisturbed
23:29 Intention bit Preventative Maintenance for Violin damping?