late entry for yesterday's maintenance
WP6446 Dust monitor install
Jeff B, Jim B:
A new LVEA Dust monitor was added to the system. A new DAQ INI file was created and installed when the DAQ was restarted
WP6451 Vacuum alarm texts
Dave:
CP4 was added back to the daily status texts. The ERROR status of all signals was added to the texts.
Restart Guardian DIAG_MAIN node:
T.J:
DIAG_MAIN was restarted, memory was recouped
New TCS_RH Guardian node:
TJ, Nutsinee
A new node was created. A new INI file was created which was install on the DAQ restart.
WP6452 Update control room GDS tools for leap second change
Jim:
New version of GDS tools was installed.
WP6450 DAQ GDS-Broadcaster reconfigure
Dave, Jim:
daqdrc for h1broadcast0 was changed to stop writing the MD5 check sum file for each frame file is creates.
Remove controlled power strip from Mechanical Room Vacuum Rack
Dave, Jim:
We removed an obsolete remote power strip from the MR Vac Rack. Richard says this was left over from iLIGO as a means of remotely powering the chamber illuminators.
DAQ Restart
Dave:
DAQ was restarted to support many of the above activities. This was a clean restart, h1broadcast0 was quick to start, but unlike the last time did not need a restart.