BRSY shows drift as one of the photodiode spots works it;s way of the photodiode. The large spike is when the box was opened to install the STS. The downward trend following thermalization shows signs of decreasing. Next weeks maintenance will be to re-center and re-zero the STS that is co-mounted to the BRS. The margin of the drift still remains good between the defined thresholds.