Laser Power Kill Ckt Tested
With the removal of all H2 electronics and cable trays, moved the kill button from the H2 PSL area to the Squeezer setup area.  Tested all five of the kill buttons to ensure they remove power from the five locations lasers can be plugged into.  They are TCS X,Y,  Diode Room,  4kPSL, Squeezer set up area.  Everything worked as designed.  Will have to repeat this process when I install a power outlet by Ham4 for the squeezer install.