Reports until 00:24, Sunday 29 January 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:24, Sunday 29 January 2017 (33705)
Ops Owl Shift Transition

Ops Shift Transition: 01/29/2017, Owl Shift 08:00 – 16:00 (00:00 - 08:00) - UTC (PT)

State of H1: IFO locked at NOMINAL_LOW_NOISE, power at 30.7W, range at 68.1 Mpc
Intent Bit: Observing
Weather: Wind is Calm (0 - 1 mph), lower 30s, and clear
Primary 0.03 – 0.1Hz: Currently at 0.08um/s and flat  
Secondary 0.1 – 0.3Hz: Currently at 0.7um/s and slightly downward
Quick Summary: In observing for the past 14 hours      
Outgoing Operator: TJ