Greg Mitchell & Hugh Back on Friday a week ago, the SEI was floated on HEPI and then locked down, see aLog 3315. Today we released the stops and adjusted the HEPI springs to level the Optical Table. We are very close and basically ready for horizontal adjustments in response to IAS. *** The Table remains free and is floating ***