TITLE: 02/02 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 64Mpc
INCOMING OPERATOR: Jim
SHIFT SUMMARY:
One fairly painless lockloss during the shift. Noted a few "loud" activities for DetChar.
LOG:
-
16:40 PSL Chiller fill (Patrick)
-
17:02-17:44 Down For Lockloss (Reason?)
-
MC lockloss during PRMI which was odd
-
17:08-17:25 Attempting to recenter STS2 (Hugh & TJ). Forgot to turn off BRSy, but did not see a rung up BRS.
-
17:50-17:53 Turning ON propane forklift engine to charge battery (Joe)---->This caused noise on DARM, don't allow!
-
18:28-19:28 GRB Stand Down completed for H1 & L1.
-
18:58 Installing new Ops Station (operator0)
-
19:00:55, 19:05:22, 19:10:16, 19:43:40-19:44:00 Mass Storage Room door slam (not seen on DARM spectra)
-
19:19 TCSy Chiller Flow Low
-
20:38 Routing timing cable to H2 Elec Room (Barker)
-
22:02:58, 22:06:15 Heard something heavy drop (in MSR?)---most likely tiles dropping for cable work.