TITLE: 02/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 69Mpc
INCOMING OPERATOR: Patrick
SHIFT SUMMARY:
Locked entire shift (14+hrs) with a rnage hovering just under 70Mpc. No new snow & temps got up to 29degF.
LOG:
Swapped out (3) halogen light bulbs in the Control Room (but found out we had LED ones after the fact) D'oh!