Reports until 15:54, Monday 06 February 2017
H1 General
edmond.merilh@LIGO.ORG - posted 15:54, Monday 06 February 2017 (33939)
Shift Summary - Day
TITLE: 02/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 59Mpc
INCOMING OPERATOR: Travis
SHIFT SUMMARY:
H1 locked the entire shift, going on 19.5 hours. Ran a2l script twice (see aLog). Winds are picking up and reaching up to just under 40mph from the SW. OAF is showing soime changes due to Heather and Sheila doing work. Livingston has been down for the better part of the last 6 hours or so. Temps are rising outside and thawing is causing lots of water runoff from the roof.
LOG:

16:05 ran a2l DTT...looks very good. It's been almost 8 hours as per TJs log.

18:06 Alarm panel in computer users room complaining about negative ground problem.

18:25 Jonathan to H2 building.

18:40 Jonathan back

21:16 Jeff into optics lab for the remainder of the day