Reports until 08:20, Tuesday 07 February 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:20, Tuesday 07 February 2017 (33963)
Ops Day Shift Transition

Ops Shift Transition: 02/07/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) - UTC (PT)

State of H1: IFO locked at NOMINAL_LOW_NOISE, power at 30.1W, range at 68.3 Mpc
Intent Bit: Maintenance
Weather: Wind is a Gentle to Moderate Breeze (8 - 18 mph), lower 20s, and partly cloudy
Primary 0.03 – 0.1Hz: Currently at 0.09 and 0.02um/s  
Secondary 0.1 – 0.3Hz:  Currently at 0.7um/s and slightly downward
Quick Summary: In observing for the past 4 hours before the start of the window      
Outgoing Operator: TJ