Reports until 10:36, Thursday 09 February 2017
LHO General
vernon.sandberg@LIGO.ORG - posted 10:36, Thursday 09 February 2017 (34024)
Work Permit Summary for 2017 February 07
Work Permit Date Description alog/status
6471.html 2017-02-07 12:00 Stop data acquisition and backup databases on conlog-test-master and conlog-test-replica. 33970
33975
33983
6470.html 2017-02-06 15:59 DARM open loop gain transfer function measurement, Pcal to DARM transfer function measurement  33942
6469.html 2017-02-06 13:07 ReCenter Beam return image: Take BRS and Sensor Correction out of loop, open igloo, center beam, wait, reinclude SC/BRS in loop.  33976
6468.html 2017-02-06 09:29 Enter PSL enclosure and evaluate the position of the Input Beam on an IO beam dump steering mirror, related to alog 33915, where I show that images suggest beam has moved and possibly far enough to be clipping. No change in beam, just pictures (if possible) or description of beam on the steering mirror.  33915
33977
33991
6467.html 2017-02-06 09:14 Place a dust monitor with an on-board pump in the closet next to the PSL enclosure where the makeup air is drawn into the PSL. This will record the particulate being drawn into the PSL enclosure. The dust monitor will be removed two days later (Thursday).  
6466.html 2017-02-03 13:28 Troubleshoot PEM STS: access VEA when IFO state permits, read voltages, center masses, power cycle--Limit Time in VEA to 5 minutes.  33999
6465.html 2017-02-02 12:47 Before the holiday break the timing fanout in the EE-Lab was directly connected to the MSR master. We will re-route this timing signal to come from the DTS fanout in the H2-building. Will require access to 3IFO area in H1 bld, and MSR underfloor. 33974
33983
       
Previous W.P.      
6460.html 2017-01-30 09:07 Set the addresses on the beckhoff terminals installed at the tables.  33782,
33971