Reports until 16:05, Thursday 09 February 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:05, Thursday 09 February 2017 (34030)
Ops Day Shift Summary
Ops Shift Log: 02/09/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: IFO locked in Observing for past 11.45 hours.      
Intent Bit: Observing
Support: N/A
Incoming Operator: Travis

Shift Summary: Ran the A2L DTT script. The Yaw signal was a bit rung up around 20 Hz. Ran the A2L script while LLO was down.

Reviewed current work permits and next weeks planned activities at 13:00 meeting.   

It has been a quiet shift with the IFO in Observing, (except for 8 minutes when I ran the A2L script), for the past 11.75 hours. Environmental conditions remain favorable.

Activity Log: Time - UTC (PT)
16:00 (08:00) Take over from TJ
18:30 (10:30) Ran A2L DTT – The Y signal is elevated. The X signal is OK
18:55 (10:55) Joe – Running snow blower around OSB & VPW (LLO down)
19:03 (11:03) Dropped to Commissioning to run A2L script while LLO was down
19:11 (11:11) Back to Observing
19:25 (11:25) Reset TIM error on H1IOPASCO
19:30 (11:30) Joe – Finished with snow blower
22:22 (14:22) Joe – Shoveling snow between Mechanical building and OSB receiving
22:40 (14:40) Joe – Finished snow shoveling
00:00 (16:00) Turn over to Travis