hugh.radkins@LIGO.ORG - posted 16:21, Wednesday 11 July 2012 (3406)
H1 HAM3 ISI Table Leveled with HEPI
Jim & Greg adjusted the level of the HAM3 ISI Table using HEPI Springs. It was a little slower than expected. We are ready for IAS to take another look before we continue with the HEPI Actuator installation.