HSTS MC1 has been moved to the testing bench and cabled to the test stand. The offsets and gains have been entered into the MEDM screens and the OSEMs have been positioned to 50% light. We will recheck and adjust the 50% light positions in the morning, if necessary. This suspension should be ready for Phase 1 testing. M1 BOSEMs T1 S/N 578 OL = 25960.0 Offset = -12980 Gain = 1.156 T2 S/N 436 OL = 29277.9 Offset = -14639 Gain = 1.025 T3 S/N 440 OL = 27858.1 Offset = -13929 Gain = 1.077 LF S/N 433 OL = 27758.7 Offset = -13879 Gain = 1.081 RT S/N 424 OL = 24529.4 Offset = -12265 Gain = 1.223 SD S/N 658 OL = 25139.5 Offset = -12570 Gain = 1.193 M2 AOSEM UL S/N 453 OL = 27359.6 Offset = -13680 Gain = 1.097 LL S/N 320 OL = 24780.7 Offset = -12390 Gain = 1.211 UR S/N 228 OL = 25117.9 Offset = -12559 Gain = 1.194 LR S/N 438 OL = 25521.6 Offset = -12761 Gain = 1.175 M3 AOSEM UL S/N 227 OL = 28354.2 Offset = -14177 Gain = 1.058 LL S/N 353 OL = 26509.5 Offset = -13255 Gain = 1.132 UR S/N 276 OL = 27920.9 Offset = -13960 Gain = 1.074 LR S/N 299 OL = 28435.2 Offset = -14218 Gain = 1.055