JeffB's alog with the start of Maintenance is HERE (alog 34122).
Mantnenance day continued:
-
18:15, Aaron Viets, restarting calibration pipeline
-
18:17, Robert, out of LVEA, heading to EX
-
18:19, delivery to OSB
-
18:23, Dave, TJ, reset guardian
-
18:24, septic tank service
-
18:25, Fil, out of LVEA
-
18:26, Aaron Veits, pipeline restarted and all ok
-
18:37, DaveB, EX then EY, check electronics
-
18:39, ChrisS and Fire Depart, MX and then EX, checkinf sensors, all done fro the day
-
18:40, JeffB, starts LVEA transition to Laser Safe
-
18:42, JeffK, Debian watchdog work complete
-
18:43, Ken (contractor) and other, entering ECR and LVEA to survey worksite
-
18:47, Christina, at EX and leaving to get supplies and will return
-
18:47, I restarted VerbalAlarms after guardian reboot
-
18:48, TJ, relocking IMC
-
19:01, LVEA is laser safe
-
19:07, Bubba back from EY, no other parties are there
-
19:07, Christina, leaving EX, all other parties have left
-
19:07, Christina, heading to LVEA
-
19:15, Kyle, to LVEA
-
19:16, vendor, Paradice Water
-
19:24, Hugh, de-isolated HAM3
-
19:24, JeffK, tripping each type of optic suspention to test new Debian watchdog fix
-
19:37, Chandra, CP1 overfill alarm, looking into it
-
19:45, Sheila and Jenne, PSL bulleye install
-
20:06, checking on all Mantenance activities
Maintenance Continues:
Outlook for reloacking both IFOs: I talked to Livingston, their planning for Commissioning until 6PM their time, 4PM local our time, 23:59UTC.
Keita called and said PSL is OK to go until 4-5PM local time, Feb 14 23:59to Feb 15 1:00UTC, if needed.