TITLE: 02/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: Commissioning since morning (bullseye detector + injection).
LOG:
16:29 Joe bringing a truck to chemical bunker
16:34 Karen driving to VPW
17:22 Take intent bit to Commissioning for Robert and Sheila
17:25 Christina opens OSB roll up door
17:44 Sheila+Robert to PSL/LVEA
18:08 Karen to H1 building
18:48 Robert out
19:02 Richard to find Sheila in LVEA
19:10 Sheila+Robert to PSL enclosure
Richard out
20:02 Jason+Betsy out (was at beer garden for an hour or so)
20:30 Robert out
20:35 Sheila to the rack by PSL
Bubba to MY
20:38 Sheila out
21:10 Robert+Sheila taking LLO down time to to injections
21:23 Marc to MY
22:00 Marc back