Ops Evening Shift Summary
Ops Shift Log: 02/17/2017, Evening Shift 00:00 – 08:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Unlocked - Relocking  
Intent Bit: Commissioning/Locking
Support: Sheila
Incoming Operator: Travis

Shift Summary: Lost lock and was unable to relock. Ran initial alignment but could not get the Y-Arm green to lock. Spoke with Sheila. We ran Dither Align on the Y-Arm. I was able to get the Y-Arm green to lock after some fine adjustments of ETMY. Completed the initial alignment and started to relock. Turned over to Travis to finish relocking.

Activity Log: Time - UTC (PT)
01:30 (17:30) Take over from Nutsinee
05:30 (21:30) Lockloss –
08:00 (00:00) Turn over to Travis