Reports until 16:29, Sunday 19 February 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:29, Sunday 19 February 2017 (34246)
Ops Evening Shift Transition
Ops Shift Transition: 02/19/2017, Evening Shift 00:00 – 08:00 (16:00 - 00:00) - UTC (PT)
State of H1: IFO locked at NLN, at 29.0W and 67.5 Mpc  
Intent Bit: Observing
Weather: Wind is Calm to a Light Breeze (0 - 7 mph), lower 50s and clear 
Primary 0.03 – 0.1Hz: Currently at 0.09um/s
Secondary 0.1 – 0.3Hz: Currently at 0.8um/s 
Quick Summary: Locked and observing. All appears normal.   
Outgoing Operator: Jim