Reports until 16:15, Thursday 23 February 2017
LHO General (DetChar)
thomas.shaffer@LIGO.ORG - posted 16:15, Thursday 23 February 2017 - last comment - 16:59, Thursday 23 February 2017(34346)
Ops Day Shift Summary

TITLE: 02/24 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 67Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY: One lock loss that was coincident with an earthquake, but I'm not sure if that was the cause or not. Using the lockloss tool i looked at different SEI and ASC channels, and there is an earthquake seen, but not nearly as big as other ones that I've seen us ride through. Relocked with no issues, but our range does seem to be trending down. Chandra had to replace a fuse for CP8 at EX which is in the VEA. I left us in Observing incase she was quiet enough, but hopefully DetChar can check to make sure.
LOG:

Comments related to this report
kyle.ryan@LIGO.ORG - 16:59, Thursday 23 February 2017 (34356)
2356 hrs UTC is when Chandra had sent out a text from the VEA